Labour
Site labour to install the seals shown on the issued drawings. Operatives hold SOLAS Safe Pass. RAMS are issued before works commence.
Firestop installation · Dublin and surrounding counties
Labour and certified materials installed to the drawings and specification you issue. For main contractors and M&E subcontractors on new-build and fit-out packages.
Scope of works
You hold the fire strategy, specification and drawings. We install to them. The quotation is labour and certified materials against the issued design.
Site labour to install the seals shown on the issued drawings. Operatives hold SOLAS Safe Pass. RAMS are issued before works commence.
Manufacturer-tested systems named on your specification. Product evidence — data sheets, Declarations of Performance, and test / ETA documents — as specified.
Penetrations, linear joints and cavity barriers as drawn. Missing details are referred to the design party. We do not invent or substitute details on site.
Scope exclusions
Exclusions are stated so the subcontract matches the works. Print the IN / OUT page with a quotation if useful.
We do not select systems or approve the fire strategy. Variations that require a new detail are referred to the designer.
We do not survey buildings to locate openings. A find-all-penetrations duty is not included in the quotation.
The contract states that we carry no design responsibility. We do not hold professional indemnity for design. We do not sign design ancillaries.
Design or survey can sit with a partner on a separate contract. The quotation remains for installation only.
Clients
New-build and fit-out packages. We are not a survey-led remediation practice.
Commercial
Drawings, fire specification and schedules. We price from what is issued.
Certified systems named on the specification. Not a design fee.
Unspecified openings are treated as provisional. We do not search the building for additional openings.
Photographs, seal register, and an install-to-details ancillary for the Assigned Certifier.
Documents
A quotation is prepared from the pack you issue. If a document is not available, say so — we will state the assumption or a provisional sum.
BCAR
Install-only does not mean an absence of paperwork. It means we do not issue a design certificate. The Assigned Certifier still requires evidence that the installation matches the issued details.
Before, during and after. Referenced to seal IDs so the pack can be read against the register.
ID, location, system, date, installer. The record used by the O&M file and the Assigned Certifier.
Data sheets, Declarations of Performance, and fire test / ETA evidence for the systems installed.
Construction ancillary certificate: installation to issued details only. Not a design ancillary.
| Seal ID | Location | Substrate | System | Date | Installer |
|---|---|---|---|---|---|
| R2-L3-014 | Riser 2, level 3, north | Masonry wall | As specified | — | — |
| R2-L3-015 | Riser 2, level 3, north | Masonry wall | As specified | — | — |
| C1-L1-008 | Corridor 1, level 1 | Shaft wall | As specified | — | — |
| HW-L4-003 | Head of wall, level 4 | Drylining | As specified | — | — |
Specimen layout — not a live project. See the handover pack.
Coverage
Based at A83 FC42, Ardnamullan, Clonard, Co. Meath — Enfield / Summerhill. Access to west and north Dublin, the M4/M7, and the M1. Not a nationwide service.
Irish frame
Fire stopping on this site is described in Irish terms. We do not work to UK documents or forms.
Fire-stopping maintains compartmentation at service openings as Technical Guidance Document B requires. The fire strategy and details belong to the design team.
Construction ancillary certificate for installation to issued details. Photo log and seal register for the Assigned Certifier. Not a design ancillary.
We do not work to Approved Document B. Irish language and Irish forms only.
FAQ
Quotation
Main contractors and M&E subcontractors: please provide the site location and the documents you can issue. We quote for installation only.
Phone +353 87 919 9059
Email dean@lineach.com